U23080R1 - Armory Arch Stucco & Curtainwall Replacement
Pre-Bid Information
12/30/2025 10:00 AM CT
A mandatory virtual pre-bid conference for all parties interested in
bidding the project will be held at 10:00am on 12/18/2025 through a zoom call,
Telephone: 312-626-6799, Meeting URL:
https://illinois.zoom.us/j/88355991715?pwd=E1X2izyKSjBbsv5oh9AhqmW4tagvng.1&fro
m=addon Meeting ID: 883 5599 1715,Password:1867.
A second mandatory virtual prebid
conference will be held at 10:00am on 01/06/2026 through Phone: (312) 626-6799,
Meeting URL:
https://illinois.zoom.us/j/82532488637?pwd=OMTUNkpVRU2Ee3763tJ0k47lDXzB0a.1&fr
om=addon Meeting ID: 825 3248 8637, Password: 1867. Representatives of the Owner
and the Professional Services Consultant will be present to answer questions regarding
the project and bidding procedures. All prospective bidders are only REQUIRED to attend
ONE(1) of the two available pre-bid meetings.
Bid Information
01/15/2026 02:00 PM CT
Electronic Bids will be received up to the hour of 2:00pm, prevailing time,
on 1/15/2026.
Electronic bids will be electronically opened and publicly
read on 1/15/2026 / 2:30pm on a zoom call-in telephone number 312-626-6799,
Meeting URL:
https://illinois.zoom.us/j/89962179750?pwd=brUtLqjFa5hogQPbYObzXkD9bV8af
b.1&from=addon Meeting ID: 899 6217 9750,Password:1867 and tabulated. A
recording of the bid opening is available upon request.
Deadline for bidder Requests for Information (RFI) is 7 calendar days prior to Bid
Opening date and time, unless otherwise specified.
Site Visit Information
An optional onsite walk-through will be
held at 1:00 pm on 12/18/2025, interested parties are asked to meet at the SW entrance
to the Armory and a guided tour will be held through the project site.
Description
The Armory has two barrel-ended facades at its east and west ends, enclosed with
stucco arches and wooden window walls. These systems are over 100 years old and
require replacement. The arches consist of several stucco systems, including those at the
face, soffit, piers, and interior areas, which shall be repaired and replaced in-kind as
shown. The existing window wall system shall be replaced with a compatible thermally
broken aluminum window system that matches the existing historic profiles of the original
system. The majority of work must be undertaken from the exterior to minimize impact on
interior mezzanine-level MEP systems and scaffolding impacts to adjacent spaces. The
scaffolding diagram is proposed to limit work on the existing low capacity perimeter roofs
and disruption to new roofing at the east side.Refer to Division 01 of the technical
specifications for a complete, detailed breakdown of the base bids and alternates for this
project. This project includes a Project Labor Agreement that will be executed between
the lowest responsible/responsive bidder and the East Central Illinois Building and
Construction Trades Council. A copy of the Project Labor Agreement is included at the
end of Section 00 90 00.
Refer to Division 01 of the technical specifications for a complete, detailed breakdown of
the base bids and alternates for this project.